Building Foundries in the Middle East
Complete foundry lines from a single German manufacturer: sand preparation, moulding, pouring, reclamation and the cooling a hot shop needs. Axmann has been delivering to the region since 1956, and the work here has only grown since.
70 Years in the Region
First sand plant to Cairo in 1956
25 Tonnes Over 6 Metres
Mould box turning beam, Cairo 2023
30 t/h Sand Preparation
The largest mixer we shipped to Cairo
4 × 4 Metre Unpacking
Station rated for a 25 tonne load
Axmann in the Middle East and North Africa
The first Axmann sand preparation plant went to Cairo in 1956, and deliveries have continued in every decade since. What follows is a part of what we have done here, the projects worth telling you about. Plenty of smaller work sits between these dates, a mixer here and a reclamation rebuilt there, and none of it ever made a timeline.
First Plant in Cairo
A sand preparation plant for an Egyptian foundry, followed by two more in Cairo before 1960. The same decade brought the first deliveries to Israel.
Turkey, Three Plants
A Turkish foundry group takes three Supermix sand preparation plants between 1969 and 1974. Tunisia follows in 1975.
Helwan and a Cold-Resin Shop
A TURBOMIX plant for the steelworks at Helwan, and in the same year a complete cold-resin moulding shop in Cairo.
Dubai, 25 Tonnes on a Standing Line
A casting and cooling line in Dubai rebuilt to carry a 25 tonne load, in a plant that kept producing around the work. The same job we had finished in a German foundry two years earlier.
A Complete Line in Cairo
Sand mixer at 30 t/h, moulding line with vibrating table and coating station, a 2.7 by 2.7 metre shakeout rated for 10 tonnes, reclamation at 10 t/h, filter plant and water recooling.
A Second Cairo Plant, and Istanbul
A second Cairo plant takes three mixers at 30, 10 and 5 t/h, a six metre turning beam for 25 tonne mould boxes, a 4 by 4 metre unpacking station and reclamation at 20 t/h. In Istanbul, a 10 t/h mixer and an 8 t/h sand classifier and heater with pneumatic conveying.
Cores in Cairo
A core shooting machine and a core coating station for the cold-box amine process, the third consecutive year of building at the same site.
Three Years of Building in Cairo
Three consecutive build years in Cairo, across two plants, with a mixer and a sand classifier going to Istanbul in between.
| Year | What was installed | Rated at |
|---|---|---|
| 2022 | Cairo. Continuous sand mixer, moulding line with vibrating table and coating station, shakeout station 2.7 × 2.7 m, sand reclamation, filter plant and water recooling | Mixer 30 t/h · reclamation 10 t/h · shakeout 10 t |
| 2023 | Cairo. Three continuous sand mixers, mould box turning beam 6,000 mm, unpacking station 4.0 × 4.0 m, sand reclamation, filter plant and water recooling | Mixers 30 / 10 / 5 t/h · turning beam 25 t · unpacking 25 t · reclamation 20 t/h |
| 2023 | Istanbul. Continuous sand mixer TMS10, and a sand classifier and heater with pneumatic conveying | Mixer 10 t/h · classifier 8 t/h |
| 2024 | Cairo. Core shooting machine and core coating station for the cold-box amine process | Cold-box amine |
Water recooling and a filter plant were part of the scope in both Cairo lines, not options added later. In this climate they are what keeps the sand usable and the hall breathable.
In a Hot Shop, Sand Temperature Decides the Shift
A line drawn for a German foundry in October behaves differently in a hall that sits at forty degrees for five months of the year. The machines are the same; what changes is where the heat goes. Warm sand shortens the working time of a furan or phenolic binder, the crew adds hardener to keep up, consumption climbs, and the mould still strips soft. The symptom shows at the moulding station. The cause is upstream.

Where the Heat Comes From
Sand leaves the shakeout hot and the reclamation warm. In a temperate shop it cools between cycles. In a hall that already sits at forty degrees it never gets the chance, and the circuit climbs shift by shift.

What We Fit
A cooler in the return loop, sand temperature measured before the mixer rather than guessed at, and dosing that compensates for what it reads. Both Cairo lines also shipped with water recooling, specified at order stage.

Dust From Two Directions
Extraction at the shakeout, the mixer and the reclamation, with the filter plant sized for the duty rather than the catalogue. Here the outside air brings its own load, so intake and filter life are part of the same calculation.
If You Are Building in the Gulf
We have worked in the Emirates. In 2015 a casting and cooling line in Dubai was rebuilt to carry a 25 tonne load, the same job we had done in a German foundry two years earlier. The wider installed base in this part of the world is in Egypt, Turkey, Israel and Tunisia.
In Saudi Arabia and Qatar we have not built yet, and we would rather say so than let a map on a website imply otherwise. What a project there gets is what those plants got. One contract for the whole line instead of five suppliers and the gaps between them. Equipment engineered in Germany for the supply, the climate and the standards you specify, before anything is drawn. And a reference you can check: the newest Axmann equipment in the region went into a Cairo foundry in 2024.
Our oldest machine
62+ years oldA mixer we built in the 1960s is still in daily production. For a plant manager weighing capital spend against the cost of downtime, that is the number that matters: not what a machine does in its first year, but what it still does in its fortieth. We build to be the oldest working machine in your plant.
Answered Inside Your Shift
Most of what goes wrong on a line never needs anyone to get on a plane. Our working day overlaps yours almost completely, so a question asked at the start of your shift is usually answered before it ends, and the few things that do need an engineer on site get planned instead of improvised.
Remote PLC Diagnostics
Most faults on a modern line are control faults, and those we diagnose by connecting to the PLC. No flight, no waiting: the people who wrote the logic read the fault themselves, inside your shift rather than after it.
Parts on Your Shelf
A critical-spares package is defined together with the line, so the parts that stop production sit in your store before you need them. Everything else leaves the works by express freight, and we tell you the date it ships rather than the date we hope.
Serviceable Components
Where a standard component will do the job, we specify one you can source locally. Proprietary parts tie you to a supply chain you do not control, and that is not in your interest or ours.
Engineers Who Travel
Commissioning and major interventions are done on site by our own engineers, not by subcontractors reading a manual. The people who built the line are the people who start it up.
The Drawing Is Still Here
Every drawing since 1909 is in our own archive. That matters more the further a machine is from its maker: send us a photograph of the nameplate and the part is identified against the original, whatever year it left the works.
Shipping and Import, Stated Up Front
Delivery terms, lead time, packing lists, HS classifications and any duties are set out in the offer itself, so there are no surprises between the purchase order and the plant floor.
The Supply You Actually Have
Voltage, frequency and the switchgear standard are agreed before we draw, the same way we build to 480 V and 60 Hz for North America. Panels, drives and motors are specified for the supply in your hall, not converted on site once the container is open.
Planned Into a Shutdown
Work on a running plant is measured in days or weeks depending on what it touches. We name that window before the order rather than after it, and fit it into a shutdown you already have in the calendar.
Meet Us
at GIFA 2027.
AFS Metalcasting Congress comes to Cleveland in April 2027. Two months later, we exhibit at GIFA in Düsseldorf.
- Date
- 21–25 June 2027
- Venue
- Messe Düsseldorf
- Stand
- Hall 16 · A57
Frequently Asked Questions
Yes, since 1956, when the first sand preparation plant went to Cairo. Deliveries have continued to Egypt, Turkey, Israel, Tunisia and the Emirates in every decade since. The most recent work is a complete moulding and sand plant in Cairo in 2022, a larger second stage in 2023, and a cold-box core shop in 2024, with a mixer and a sand classifier delivered to Istanbul in 2023.
In the Emirates, yes: a casting and cooling line in Dubai was rebuilt in 2015 to carry a 25 tonne load. In Saudi Arabia and Qatar, not yet, and we will not pretend otherwise. Everything we build ships worldwide from Wenden-Gerlingen, and a Gulf project is engineered the same way as the Egyptian ones: to the supply, the climate and the standards written into the order.
With a cooler in the return loop, sand temperature measured before the mixer, and binder and hardener dosing that compensates for what it reads. Both Cairo lines also shipped with a water recooling system as part of the plant. Warm sand shortens the working time of furan and phenolic binders, so if it is not dealt with in the sand circuit it is paid for in hardener and in soft moulds.
Usually, and often for a fraction of a new line. Controls, dosing, dust extraction, reclamation and drives can each be renewed on their own, on a plant that keeps running between the steps. There is a page setting out twelve of these jobs, each starting from the symptom you would recognise on the floor.
Whatever is in your hall. Voltage, frequency and the switchgear standard are agreed before anything is drawn, the same way we build to 480 V and 60 Hz for North America. Panels, drives and motors are specified for that supply rather than converted on site once the container is open.
Our own engineers, on site. Commissioning and major interventions are not subcontracted. Day to day, most faults on a modern line are control faults and are diagnosed by connecting to the PLC from Germany, which in this region happens inside the same working day.
Tell Us About Your Line
Castings, target output, the constraint you are trying to fix and the code requirements at your site. Our engineers answer personally, typically within one business day.
Looking for a different machine?
View All Products